of Chinese Stone Machinery
Wind Turbine Blade Epoxy Structural Adhesive WD3135D/WD3137D
WD3135D wind turbine blades special glue (main agent), WD3137D wind turbine blades special glue (curing agent) is a two-component, solvent-free epoxy adhesive, after curing with high strength, high toughness, low density and other high performance, suitable for wind power blades and similar large-scale composite structural parts of the bonding.
Adhesive for high-touch paste, in the facade or large gap does not flow. The vertical elevation of the mixture is above 4 cm. This product is suitable for mechanical glue, at room temperature after coating, and then through the 70 ℃ ~ 80 ℃ heat curing, cooling to achieve the best performance.
Wind Turbine Blade Vacuum Sealant Tape WD209
WD209 Wind turbine blade sealing tape is mainly composed by synthetic rubber and special high quality polymer materials. It is specially manufactured, environment friendly, solvent free, curing free and pressure sensitive sealing adhesive, and it has good bonding force to various materials surface. It has excellent adaptability to expansion, contraction and mechanical deformation of material surface. It is also a good sealing, damping and protection material out of wind blade manufacture.
Wind Turbine Blade Epoxy Structural Adhesive WD3135D/WD3137D | Wind Turbine Blade Vacuum Sealant Tape WD209 |
Accredited by GL; | Environmentally friendly, solvent-free; |
Lower density, higher toughness and other advanced properties after curing; | High bonding strength and tensile strength, good elastic elongation; |
Excellent sag resistence and fatigue resistence; | Perfect waterproof,sealing, high and low temperature followability ; |
Low exothermal peak,long operation time. | Excellent chemical resistance, weather resistance and corrosion resistance; |
Ready to use, easy to remove, no residue. |
Applicable to the bonding and modification of super large wind power blades, offshore wind blades and other similar large composite structures.
The sealing of vacuum filling in wind blade manufacturing;
According to your actual needs, choose the most reasonable overall design and planning procedures