We are offering Bulletproof Fabric (UD Sheet) which is consisted of two plies of unidirectional fiber which cross-plied by 90 degrees each other with special adhesive and certain technology. The outward appearance is white textile fiber thin slice.
Its soft and long-chain structure in the UHMWPE fiber makes it possible for the impact energy of bullets to be rapidly scattered to larger areas, it could easily decentralize the bullet impact energy in a very short time.
The bulletproof Vest/Jacket/Plate made by our UD sheet (PE or Kevlar material) can reach the protection level like NIJ IIIA (9MM or .44), III, IV etc. Their Test Reports a were Made by American a H.P.White Laboratory, INCa
Clients can avail this Bulletproof UD Sheet at industry leading prices from us.
Product brand description | ||||||||||
Soft weft free cloth | ||||||||||
Brand |
The raw materials |
Type |
The surface density (g/m squared) |
Width (m) |
The length of the (m) |
Product features |
Bullet-proof performance |
|||
NIJ Ⅲ A (0.44SJHP) |
GA141 three-level |
|||||||||
Surface density (kg/m²) |
The layer number |
Surface density (kg/m²) |
The layer number |
|||||||
UHMWPE fiber |
||||||||||
ES332 |
6UD |
170 + 10 |
1.2/1.6 |
150 | Excellent anti-elasticity, light weight and strong anti-deformation ability |
4.25 |
25 |
4.42 |
26 |
|
ES322 |
6UD |
160 + 10 |
1.2/1.6 |
150 | Excellent anti-elasticity, high cost performance and strong anti-deformation ability |
5.02 |
31 |
5.28 |
33 |
|
ES323 |
6UD |
210 + 10 |
1.2/1.6 |
100 | Excellent anti-elastic, cost-effective |
5.25 |
25 |
6.09 |
29 |
|
AS201 |
Aramid fibers |
4UD |
240 + 10 |
1.2/1.6 |
100 | Excellent bulletproof performance, strong deformation resistance |
- |
- |
5.56 |
23 |
AS211 |
4UD |
240 + 10 |
1.2/1.6 |
100 | Excellent bulletproof performance, good flexibility |
- |
- |
6.58 |
28 |
Pass the international NIJⅡ, NIJⅡA, NIJⅢA ballistic performance test
Pass domestic GA141-2017 level 2, GA141-2017 level 3 ballistic performance test
Packaging Details: Roll Packing
Port: Shanghai Port and Ningbo Port, etc.
Lead Time:
Quantity(kilograms) | 1 - 10 | 11 - 1000 | >1000 |
Est. Time(days) | 10 | 20 | To be negotiated |
According to your actual needs, choose the most reasonable overall design and planning procedures