QL Cabinets Network Cabinet 19” Data Center Cabinet

Introduction

♦ Front door: Hexagonal reticular high density vented plate door.

♦ Rear door: Double-section Hexagonal reticular high density vented plate door.

♦ Static loading capacity: 2400 (KG).

♦ Degree of Protection: IP20.

♦ Package Type: Disassembly.

♦ Salt spray test: 480 hours.

♦ Ventilation Rate: >75%.

♦ Mechanical structure door panel.

♦ Powder coated mounting profiles with U-mark.

Product Details

Product Tags

Product Features

Details

Materials

SPCC cold rolled steel

Frame

Disassembly/Welded frame

Width (mm)

600/800

Depth (mm)

1000.1100.1200

Capacity (U)

42U.47U

Front/Rear door

Mechanical structure door

Side panels

Removable side panels

Thickness (mm)

Mounting profile 2.0,Frame 1.5mm, Side panels 1.0mm, Others 1.2mm

Surface finish

Degreasing, Silanization,Electrostatic spray

Color

Black RAL9005SN(01) / Gray RAL7035SN(00)

Product  Specification

Model No.

Description

QL3.■■■■.9600

Hexagonal reticular high density vented plate front door, double-section hexagonal reticular high density vented plate rear door, gray

QL3.■■■■.9601

Hexagonal reticular high density vented plate front door, double-section hexagonal reticular high density vented plate rear door, black

QL3.■■■■.9800

Hexagonal reticular high density vented plate front door, hexagonal reticular high density vented plate rear door gray

QL3.■■■■.9801

Hexagonal reticular high density vented plate front door, hexagonal reticular high density vented plate rear door, black

Remarks: ■■■■ First ■ denotes width,second ■ denotes depth,third & fourth ■ denotes capacity.

Standard Configuration

Standard Configuration

S/N

Name

Quantity

Unit

Material

Surface Finish

Remark

1

Frame

1

set

1.5mm SPCC cold rolled steel

Electrostatic spray

2

Top Cover

1

piece

1.2mm SPCC cold rolled steel

Electrostatic spray

3

Bottom Panel

1

piece

1.2mm SPCC cold rolled steel

Electrostatic spray

4

Front door

1

piece

1.2mm SPCC cold rolled steel

Electrostatic spray

5

Rear door

1

piece

1.2mm SPCC cold rolled steel

Electrostatic spray

6

Side panel

2

piece

1.0mm SPCC cold rolled steel

Electrostatic spray

7

Mounting profile

4

piece

2.0mm SPCC cold rolled steel

Electrostatic spray

8

Mounting plate

8

piece

1.5mm SPCC cold rolled steel

Electrostatic spray

6pcs for lower 47U

9

Spacer block

12

piece

2.0mm SPCC cold rolled steel

Electrostatic spray

Spacer block and sealing baffle only for width 800 cabinets

10

Sealing baffle

1

set

1.2mm SPCC cold rolled steel

Electrostatic spray

11

2” Heavy duty casters

4

piece

12

T-Type Allen Wrench

1

piece

13

M6 square screw & nut

40

set

14

Screws and nuts for combining cabinets

6

set

15

Screws and nuts for connecting base

4

set

Payment & Warranty

Payment

For FCL (Full Container Load), 30% deposit before production, 70% balance payment before shippment.
For LCL (Less than Container Load), 100% payment before production.

Warranty

1 year limited warranty.

Shipping

• For FCL (Full Container Load), FOB Ningbo, China.

• For LCL (Less than Container Load), EXW.

FAQ

How to sort out the cabinet?

First inform the user to organize the cabinet without affecting the normal work. According to the topological structure of the network, the existing equipment, the number of users, user grouping and other factors, draw the wiring diagram and equipment location diagram inside the cabinet. Next, prepare the required materials: network jumpers, label paper, and various types of plastic cable ties.

Download

QL

QL-PA861


  • Previous:
  • Next:

  • Write your message here and send it to us

    Professional technical engineer dedicated to guide you

    According to your actual needs, choose the most reasonable overall design and planning procedures