of Chinese Stone Machinery
PAM FOR OIL EXPLOITATION APPLICATION
The company can customize different types of polymers according to different location conditions (ground temperature, salinity, permeability, oil viscosity) and other indicators of each block of the oilfield, so as to effectively improve oil recovery rate and reduce water content.
Model Number | Electric density | Molecular weight | Application |
7226 | Middle | High | Medium low salinity, medium low geotemperature |
60415 | Low | High | Medium salinity, medium geotemperature |
61305 | Very low | High | High salinity, high geotemperature |
Efficient drag reducing agent for fracturing, widely used in fracturing drag reduction and sand carrying in shale oil and gas production.
It has following characteristics:
i) Ready to use, has high drag reduction and sand carrying performance, easy to flow back.
ii) There are different models suitable for the preparation both with fresh water and salt water.
Model Number | Electric density | Molecular weight | Application |
7196 | Middle | High | Clean water and low brine |
7226 | Middle | High | Low to medium brine |
40415 | Low | High | Medium brine |
41305 | Very low | High | High brine |
According to different geological conditions and pore size, the molecular weight can be selected among 500,000 and 20 million, which can realize three different ways of profile control and water plugging function: delaying cross-linking, pre-crosslinking and secondary cross-linking.
Model Number | Electric density | Molecular weight |
5011 | Very low | Extreme low |
7052 | Middle | Medium |
7226 | Middle | High |
Applying drilling fluid coating agent to drilling fluid can effectively control the apparent viscosity, plastic viscosity and filtration loss. It can effectively wrap the cuttings and prevent the cuttings mud from dration, which is beneficial to stable the well wall, and also give the fluid with the resistance to high temperature and salt.
Model Number | Electric density | Molecular weight |
6056 | Middle | Middle low |
7166 | Middle | High |
40415 | Low | High |
Package:
·25kg PE bag
·25KG 3-in-1 composite bag with PE liner
·1000kg Jumbo Bag
1. What are your prices?
Our prices are subject to change depending on supply and other market factors. We will send you an updated price list after your company contact us for further information.
2.Do you have a minimum order quantity?
Yes, we require all international orders to have an ongoing minimum order quantity. If you are looking to resell but in much smaller quantities, we recommend you check out our website.
3.Can you supply the relevant documentation?
Yes, we can provide most documentation including Certificates of Analysis / Conformance; Insurance; Origin, and other export documents where required.
4.What is the average lead time?
For samples, the lead time is about 7 days. For mass production, the lead time is 20-30 days after receiving the deposit payment. The lead times become effective when (1) we have received your deposit, and (2) we have your final approval for your products. If our lead times do not work with your deadline, please go over your requirements with your sale. In all cases we will try to accommodate your needs. In most cases we are able to do so.
5.What kinds of payment methods do you accept?
You can make the payment to our bank account, Western Union or PayPal:
30% deposit in advance, 70% balance against the copy of B/L.
According to your actual needs, choose the most reasonable overall design and planning procedures