of Chinese Stone Machinery
FAQ
Q: Are you the manufacturer of this product?
A: Yes, since 1994.
Q: Do you have CE mark for this product?
A: Yes.
Q: Is you company ISO certified?
A: Yes.
Q: How many years warranty for this product?
A: Two years warranty.
Q: Date of delivery?
A: Normally within 1-5 working days after payment received.
Q: Is it capable of horizontal stacking of more than two pumps?
A: Yes, it is stackable up to 4 pumps or 6 pumps.
Specifications
Model | KL-602 |
Syringe Size | 10, 20, 30, 50/60 ml |
Applicable Syringe | Compatible with syringe of any standard |
VTBI | 0.1-9999 ml<1000 ml in 0.1 ml increments≥1000 ml in 1 ml increments |
Flow Rate | Syringe 10 ml: 0.1-400 ml/hSyringe 20 ml: 0.1-600 ml/hSyringe 30 ml: 0.1-900 ml/hSyringe 50/60 ml: 0.1-1300 ml/h
<100 ml/h in 0.1 ml/h increments ≥100 ml/h in 1 ml/h increments |
Bolus Rate | 400 ml/h-1300 ml/h, adjustable |
Anti-Bolus | Automatic |
Accuracy | ±2% (mechanical accuracy ≤1%) |
Infusion Mode | Flow rate: ml/min, ml/hTime-basedBody weight: mg/kg/min, mg/kg/h, ug/kg/min, ug/kg/h etc. |
KVO Rate | 0.1-1 ml/h (in 0.1 ml/h increments) |
Alarms | Occlusion, near empty, end program, low battery, end battery,AC power off, motor malfunction, system malfunction, standby,pressure sensor error, syringe installation error, syringe drop off |
Additional Features | Real-time infused volume, automatic power switching,automatic syringe identification, mute key, purge, bolus, anti-bolus,system memory, key locker |
Drug Library | Available |
Occlusion Sensitivity | High, medium, low |
Docking Station | Stackable up to 4-in-1 or 6-in-1 Docking Station with single power cord |
Wireless Management | Optional |
Power Supply, AC | 110/230 V (optional), 50/60 Hz, 20 VA |
Battery | 9.6±1.6 V, rechargeable |
Battery Life | 7 hours at 5 ml/h |
Working Temperature | 5-40℃ |
Relative Humidity | 20-90% |
Atmospheric Pressure | 860-1060 hpa |
Size | 314*167*140 mm |
Weight | 2.5 kg |
Safety Classification | Class Ⅱ, type CF |
According to your actual needs, choose the most reasonable overall design and planning procedures